HCM City studies new Ring Roads 4.5 and 5 to expand regional

HCM City studies Ring

HCM City studies new Ring Roads 4.5 and 5 to expand regional connectivity

Accordingly, september 10 2026 | 16:30 HCM City studies new Ring Roads 4.5. Moreover, 5 to expand regional connectivity Thanh Th&#x1EE7 y The city is preparing a master plan for 2025-2050 with a 100-year vision. In contrast, is considering additional external transport infrastructure to improve regional connectivity.

Accordingly, september 10 2026 | 16:30 HCM City studies new Ring Roads 4.5. For businesses, the practical issue is how HCM City studies changes market entry, compliance, and partner selection.

For businesses navigating these developments, V-International Business Consultancy Services provides expert guidance on market entry, compliance, and strategic planning.

Hcm City Studies Trends

create new development space. On the other hand, a view of H&#x1ECD Ch&#x1ECB Minh City (Photo: Thanh Thuy) Ho Chi Minh City is studying the addition of Ring Roads 4.5. 5 with a combined length of approximately 632-679 km to strengthen transport links with southeastern cities. Nevertheless, provinces expand connectivity to the Central Highlands south-central coastal regions.

How Hcm City Studies Shapes Vietnam’s Growth Outlook

The practical question for market players is how HCM City studies affects timing, partners, and compliance needs.

Market Analysis and Outlook

However, according to the HCMC Department of Construction the city is preparing a master plan for 2025-2050 with a 100-year vision. However, is considering additional external transport infrastructure to improve regional connectivity. create new development space. Furthermore, ring Road 4.5 is being studied as a roughly 192-km route through HCMC.

Key Takeaways and Implications

In addition, dong Nai Tay Ninh. Accordingly, the preliminary alignment would begin at a planned interchange between Ring Road 5. Accordingly, the Bien Hoa-Vung Tau Expressway follow National Highways 56 56B. and reconnect with Ring Road 5 in Go Dau Tay Ninh.

Regional Economic Context

In addition, the proposed route would be designed as a high-speed urban arterial with limited interruptions. Subsequently, a design speed of 80-100 km/h eight lanes a planned width of about 62-80 metres. However, ring Road 5 meanwhile is envisioned as a major regional corridor linking HCMC with southeastern cities. provinces while extending connections to the south-central coast Central Highlands.

Conclusion

These developments underscore HCM City studies’s continued impact on Vietnam’s economy. Businesses that move decisively will be best positioned to capture emerging opportunities.

For more information, visit Vietnam Government Portal.

Source: https://en.vneconomy.vn/hcm-city-studies-new-ring-roads-45-and-5-to-expand-regional-connectivity.htm