Da Nang greenlights 24.5ha resettlement area for high-speed rail corridor

speed rail corridor

Da Nang greenlights 24.5ha resettlement area for high-speed rail corridor

Da Nang greenlights 24.5ha resettlement area for high-speed rail corridor The project will build technical infrastructure systems. Including ground leveling, transport roads, rainwater wastewater drainage, a wastewater treatment station, power supply. Public lighting, multi-utility service trenches, and green parks.

Da Nang greenlights 24.5ha resettlement area for high-speed rail corridor The project will build technical infrastructure systems. For travelers, the practical note is how speed rail corridor fits into a realistic Vietnam day.

Planning a trip around speed rail corridor? V-International Business Consultancy Services can help shape a practical Vietnam itinerary.

Speed Rail Corridor in Practice

The current Da Nang Railway Station. (Photo: Ngo Anh Van) project 5: The Resettlement Area in Hoa Tien Commune to serve the country’s North–South High-Speed Railway $14.7 million). The project is scheduled for implementation from 2026 to 2029. The designated site covers an area of over 24.5 ha.

How to Place Speed Rail Corridor in Your Route

Key figures include $14.7 million. These numbers show how speed rail corridor is unfolding in practice.

What to Expect on the Ground

Under the 1/500-scale detailed master plan, the project

For deeper insights, explore our related coverage: National Assembly Chairman: Transition from pre-inspection to post-inspection must create breakthroughs for digital economy development and Vietnam links tourism and domestic trade to boost sales of local products.

Conclusion

Speed Rail Corridor is a useful stop when you want quiet roads and time to look around. Keep the day flexible, and leave space for weather and slow meals.

For more information, visit Vietnam Ministry of Planning and Investment.

Source: https://en.vneconomy.vn/da-nang-greenlights-245ha-resettlement-area-for-high-speed-rail-corridor.htm